Skip to main content
Nine Industries.
One Team.
  • Healthcare
  • Manufacturing
  • PropTech
  • AI EdTech
  • E-commerce
  • Retail
  • Textile
  • CleanTech
  • Telecom

Work that ships. Nine industries. One team.

Healthcare: MedCollect. Manufacturing: Skyline. PropTech: Aliste. AI EdTech: Jumbl. E-commerce: DellStore, Turpai. Retail: JIJIBAI. Textile: Radhey Fashion. CleanTech: SunZero. Telecom: RedPocket Mobile.
HealthcareUSA2026

Optum-integrated medical billing that closes claims in under 12 seconds.

  • React
  • Node.js
  • MongoDB
  • Optum REST
  • HIPAA cloud

<12s

claim submission

837Pauto-validation
LiveCase study coming soon

N° 04 — Case studies

Skyline Elevators

Manufacturing

Proposal-to-contract platform for an NYC elevator firm. 12 modules, 4 elevator types, one source of truth.

  • React 18
  • Vite
  • Redux Toolkit
  • React Query
  • Radix
  • Google Maps

modules shipped

Soon
4elevator types supported
Live

Aliste Technologies

PropTech

Smart sub-metering for residential property. Zero upfront cost. Sub-30-second QR recharge.

  • React Native
  • Node.js
  • Apollo GraphQL
  • MongoDB
  • MQTT

150K+

lives impacted

Soon
~100%bill recovery
Live

Jumbl

AI EdTech

AI mock-interview platform pairing students with paid internships at 100+ startups.

  • Framer
  • React.js
  • React Native
  • Node.js
  • OpenAI

Indian startups

Soon
JD-pasteAI interview engine
Live

DellStore

E-commerce

India's Dell store rebuilt on Magento 2 + Laravel microservices. Handles peak load without flinching.

  • Magento 2
  • Laravel
  • MySQL + Redis
  • AWS EC2
  • Braintree

12-mo

No-Cost EMI engine

Soon
B2C+SMBrole-based catalog
Live

SunZero

CleanTech

Real-time energy intelligence portal for India's first integrated clean-infrastructure platform.

  • Next.js
  • Python
  • FastAPI
  • TimescaleDB
  • MQTT

C&I installations

Soon
3role-based portals
Live

Turpai

E-commerce

Storefront and ops stack for a fast-growing Indian apparel brand.

  • Shopify
  • React
  • Node.js

Live

production rollout

Soon
Mobile-firstcheckout flow
In production

JIJIBAI

Retail

Retail commerce and inventory stack for a heritage Indian brand.

  • React
  • Node.js
  • Postgres

Live

store + admin

Soon
Multi-SKUinventory engine
In production

Radhey Fashion

Textile

Catalog and order pipeline for a textile manufacturer shipping globally.

  • Next.js
  • Node.js
  • Postgres

B2B

buyer portal

Soon
Multi-millorder routing
In production

RedPocket Mobile

Telecom

Prepaid mobile carrier platform with self-serve activation and porting.

  • React
  • Node.js
  • PostgreSQL

Self-serve

activation flow

Soon
Port-innumber migration
In production

N° 05 — Playbook

Full method

Step 01

Scope

One-page SOW. Fixed cost. Zero meetings before the demo.

Step 02

Ship

Two-week sprints. Friday demos. Code in production by week three.

Step 03

Measure

Telemetry from day one. Every claim, every queue, every dollar.

N° 06 — Numbers that moved

Audited 2026.05

Four numbers, four real engagements.

No round-number brags — each one starts hollow and fills with light, from where it began to where we left it. Every stat traces to a production system in the case studies above.

Aliste · PropTech sub-metering

Lives impacted

from 0 in 16 weeks

Lives impacted: 150K+, from 0 in 16 weeks

MedCollect · claim submission

First-pass yield

up from 70% industry avg

First-pass yield: 90%+, up from 70% industry avg

MedCollect · Optum REST

Claim submission

vs 14-day legacy cycle

Claim submission: <12s, vs 14-day legacy cycle

SunZero · CleanTech portal

Telemetry sites

TimescaleDB · ms queries

Telemetry sites: 100+, TimescaleDB · ms queries

Read more in the case studies

Every number above is traceable to a production system you can audit.

N° 07 — Voices

What the teams actually said.

They shipped what three other vendors couldn't. Our claim cycle went from days to seconds.

Engineering lead · Director of Platform

MedCollect · Healthcare RCM

Friday demos meant we caught the wrong assumption in week two, not month six. That alone saved the project.

Product owner · Head of Digital

Skyline Elevators · NYC

Bill recovery jumped from 73% to nearly 100%. Tenants stopped calling. Managers got their evenings back.

Operations lead · VP, Property Tech

Aliste Technologies · India

Names abridged for client confidentiality · originals available on request

№ 08What's next

Want to be thenext case study?

You scrolled through ten engagements — end of the loop, start of yours. Send a one-paragraph problem statement and a plan comes back inside 48 hours.